This attractive shelf is made from upcycled rough sawn material, made from the wood we have left over from making our garden troughs. This is sustainable material so we try to use all of our offcuts and have very little waste. It is 52cm high x 41cm wide x 12cm thick. The shelves are 25cm wide. It has been sanded and stained and comes with 2 fixed mounting plates (wall fixings not supplied) Please take care to ensure that the walls that you are fixing the shelves to are suitable for these shelves and the weight they will hold. Carriage is included in the price providing you are not offshore or in the Highlands Despatch 7/10 working days
Wall mounted shelving unit with 4 shelves (including the top) made from reclaimed scaffold board, sanded and stained in a choice of colours. As this is reclaimed board it will have its own unique character this is 56cm high x 20cm wide x 13cm deep (actual shelves are 11cm) Ideal for use in all areas of the home It comes with 2 fixed mounting plates (wall fixings are not supplied) Please take care to ensure that the walls that you are fixing the shelves to are suitable for these shelves and the weight they will hold.
Made from upcycled scaffolding boards this solid planter is 50cm long x 27cm wide x 24cm high (with feet). Internally it is 44cm long x 20cm wide x 20cm deep. As it is made from upcycled material each trough will be slightly different with is own character. This price includes delivery providing you are not off shore Despatch 7/10 working days
Available in a variety of lengths this border or lawn edging has strong posts to hold the edging firmly in the ground. Made from good quality sustainable timber obtained locally, this has been treated with a bio friendly preservative to make it low maintenance. Can be easily painted to suit. The decking boards are approx 14cm wide and the legs from top to bottom are 31cm long x 5cm wide. Available in lengths of 60cm, 80cm, 100cm and 120cm (note the 100 and 120 will have an extra post in the middle for stability.) *for ease of transport the bottom screw of the post will be removed to lay the post flat on the board. The hole will be drilled and the screw supplied and the top screw will need to be tightened. Carriage is included in the price providing you are not offshore or in the Highlands Despatch:7/10 working days